Field notes  ·  2026-11-23  ·  7 min

How to read a quotation from a Chinese factory

A Chinese quotation is five numbers and four conditions. When one of them is missing, the price cannot be compared with another quote — and most arguments in this trade come from comparing two prices that were never the same thing.

1. The trade term decides what the number includes

TermThe price includesYou still pay
EXWGoods at the factory gateExport documents, trucking, freight, insurance, duty
FOBGoods loaded on the vessel at the named portOcean freight, insurance, duty, delivery
CIFGoods, ocean freight and insurance to your portDuty, port charges, delivery
DDPGoods delivered to your address with duty paidNothing else

Two quotes in different trade terms are not comparable. Convert both to a landed cost before you decide anything.

2. The unit and the quantity basis

Per piece, per set, per linear metre, per cubic metre. A banquette quoted per metre and the same banquette quoted per seat are different offers: at 1.5 metres for four seats the numbers diverge by a third. Ask for the unit in writing, and ask what quantity tier the price belongs to.

3. MOQ: per model or per colour

A 50-piece minimum per model can become 200 pieces when you want four colours, because each colour is a separate production run. Ask whether the MOQ is per model, per colour, or per order.

4. Lead time counted from what

There are three starting points and sellers use whichever is shortest: deposit received, sample approved, material in house. A 25-day lead time counted from material arrival can be 60 days from your deposit. Ask which one, and have it written on the quotation.

5. Payment terms

30% deposit and 70% before shipment is the most common structure in furniture and upholstery. The difference that matters is what the 70% is paid against: before the container leaves, or against a copy of the bill of lading. The second is better for you and most factories will accept it.

6. Validity

Fabric and foam prices move. A quotation without a validity date is not a quotation, it is a guess you will be held to later.

7. What is excluded

  • Tooling and moulds, if the product needs them.
  • Testing and certification (fire, load, electrical).
  • Retail packaging, labels and hang tags.
  • Freight, insurance and duty — unless the term is CIF or DDP.
  • Installation hardware and fitting instructions.

Three lines that look like a discount

  • A lower unit price with a lower foam density. Same look on the drawing, half the life in a restaurant.
  • A “free” sample that is already inside the unit price. Check the two numbers together.
  • “FOB” that quietly excludes export documentation. You discover it at the port.

Key facts

  • Compare quotes only at the same trade term — convert to landed cost.
  • Ask whether the MOQ is per model, per colour, or per order.
  • Ask what the lead time is counted from: deposit, sample approval, or material arrival.
  • Ask for a validity date. Fabric prices move monthly.

Written by Factory Finding, Guangzhou. We visit factories on behalf of overseas buyers and report what is there. We take no commission from any factory.

Message us on WhatsApp What the services cost